- Main
- Staff
- News
- Documents
- Photos
Wastewater
![]() |
|
Mailing Address: Phone: 360-855-1661 |
Physical Address: Phone: 360-856-1100 |
What we do...
Provide for the treatment of wastewater and the operating, monitoring and maintenance of the facilities in compliance with Federal/State Laws and Regulations and in agreement with the City's concerns for public safety, health and environmental quality. |
Wastewater
Staff
Wastewater Treatment Supervisor: |
![]() |
| Lead Plant Operator : Steve Huizinga shuizinga@ci.sedro-woolley.wa.us 360-856-1100 |
![]() |
| Utility Billing: Reta Stephenson rstephenson@ci.sedro-woolley.wa.us 360-855-0929 |
On-Duty Operator: 360-661-1834 |
| Plant Operators: Bob Blakely Ralph Kennedy Dave Schorno |
Collection Operators: Rob Macready Carrie Weyand |
Wastewater
News
- Wastewater Treatment Division receives Department of Ecology Special Recognition Award for Five Consecutive Years of Outstanding Performance, 2005-2009



Wastewater
Documents
- Fats, Oils and Grease (FOG) Information
Wastewater
Photo Gallery
Wastewater Treatment Plant (WWTP): Constructed at its current location (401 Alexander) in 1973, with substantial upgrades in 1998 and 1999, the plant serves as the main Wastewater Division Office. |
![]() |
![]() |
Oxidation Ditch |
Inspecting Sewer Lines with Closed Circuit Television (CCTV) Equipment |
![]() |
![]() |
CCTV Tracker and Camera |
Pressing Biosolids using a Roediger Belt Filter Press |
![]() |
![]() |
Cleaning Sewer Lines |
WWTP Main Entrance |
![]() |
![]() |
Loading Biosolids in Trailer bound for Boulder Park, Inc. |
Product removed from a Plugged Pump Reminder: Please do not flush baby wipes or other |
|
| Hycor Mechanical Screen | |
1.5 MGD Lakeside Oxidation Ditch |
|
| Amwell Secondary Clarifier | |
Headworks Structure |
![]() |
| Sewer Repair in Alley Right-of-Way | |
WWTP Crew |
![]() |















